Open Menu
Home
Project Info
Project Background
Project Objective
Project Location Plan
Project Layout Plan
Water Treatment Process
Construction Packages
Construction Method
Open Trench Pipe Laying
Trenchless Pipe Laying
Langat 2 Project Team
Frequent Asked Questions
Work Progress
Water Treatment Plant Works
Pakej 1B
Pakej 2A
Pakej 2B
Pakej 15
Northern Corridor Treated Water Bulk Transfer Works
Pakej 6
Pakej 7
Pakej 9
Western Corridor Treated Water Bulk Transfer Works
Pakej 4
Pakej 5
Pakej 10
Pakej 11
Pakej 12
Pakej 13
Pakej 14
Announcement
Traffic Announcements
News
Events
Public Awareness
Corporate Info
About Us
Contact Us
PAAB
Home
Project Info
Project Background
Project Objective
Project Location Plan
Project Layout Plan
Water Treatment Process
Construction Packages
Construction Method
Open Trench Pipe Laying
Trenchless Pipe Laying
Langat 2 Project Team
Frequent Asked Questions
Work Progress
Water Treatment Plant Works
Pakej 1B
Pakej 2A
Pakej 2B
Pakej 15
Northern Corridor Treated Water Bulk Transfer Works
Pakej 6
Pakej 7
Pakej 9
Western Corridor Treated Water Bulk Transfer Works
Pakej 4
Pakej 5
Pakej 10
Pakej 11
Pakej 12
Pakej 13
Pakej 14
Announcement
Traffic Announcements
News
Events
Public Awareness
Corporate Info
About Us
Contact Us
PAAB
Pakej 11 : Paip Air Terawat Utama Dari Lebuhraya Sg. Besi ke Kolam Air Sedia Ada Bukit Dengkil 2017
print
2020
2019
2018
2017
2016
Dec 17
Nov 17
Oct 17
Sep 17
Aug 17
Jul 17
Jun 17
May 17
Apr 17
Mar 17
Feb 17
Jan 17
P11 – Pipeline 2500Ø: Repairing slope (CH1650) at Sg. Kuyuh in progress.
P11 – Pipeline 2500Ø: Pipe laying works (CH5478) at PUJ 8 in progress.
P11 – Pipeline 1950Ø: Casting of Thrust Block (CH1055) at BK 6 in progress.
P11 – Pipeline 2500Ø: Casting of Thrust Block (CH1987) at Sg. Kuyuh in progress.
P11 – Pipeline 2500Ø: Casting of Anchor Block (CH1170) at DBKL/ASTRO area in progress.
P11 – Pipeline 2500Ø: Casting of Thrust Block (CH5558) at PUJ 8 in progress.
P11 – Pipeline 2500Ø: Piloting Work (CH2100) at Jalan PBS 14/7 in progress.
P11 – Pipeline 1950Ø: Sandfilling to pipeline (CH1080) at BK 6 in progress.
P11 – Pipeline 2500Ø: Excavation for Jacking Pit (CH6632) at Jalan Kinrara 6f in progress.
P11 – Pipeline 2500Ø: Formwork and Rebar Inspection at CH1266 (DBKL/ASTRO) in progress.
P11 – Pipeline 2500Ø: Pipe Laying works at CH1191 (DBKL/ASTRO) in progress.
P11 – Pipeline 2400Ø: Pipe Laying works at CH5686 (PUJ 8) in progress.
P11 – Pipeline 1950Ø: Road reinstatement works at CH1050 (BK 6) in progress.
P11 – Pipeline 2400Ø: Pipe Delivery at CH5022 (PUJ 9) in progress.
P11 – Pipeline 2500Ø: Driving in sheet piles at CH1940 (Sg. Kuyuh) in progress.
P11 – Pipeline 1400Ø: Pipe Laying works at CH700 (Jalan BS 7/12) in progress.
P11 – Pipeline 2500Ø: Construction of pile caps at CH1258 (ASTRO area) in progress.
P11 – Pipeline 2400Ø: Piloting works at CH3475 (Jalan Kasturi) in progress.
P11 – Pipeline 2500Ø: Installation of S-Bend at CH1214 (DBKL/ASTRO area) in progress.
P11 – Pipeline 2500Ø: Internal Collar welding inspection at CH1960 (Jalan PBS 14/5).
P11 – Pipeline 1950Ø: Excavation works at CH1064 (BK 6) in progress.
P11 – Pipeline 2400Ø: Excavation for Receiving Pit at CH5777 (Persiaran Puncak Jalil) in progress
P11 – Pipeline 2500Ø: Lean concrete for Pile Cap at CH1258 (ASTRO area) in progress.
P11 – Pipeline 2400Ø: Formwork installation for Thrust Block at CH4100 (Jalan Kasturi).
P11 – Pipeline 1950Ø: Pipe laying works at CH1040 (Bandar Kinrara 6) in progress.
P11 – Pipeline 1950Ø: Installation of pre-cast slab for existing U-Drain at CH1045 (BK6).
P11 – Pipeline 1400Ø: Reinstatement of existing turfing at CH375 (BS9) in progress.
P11 – Pipeline 2400Ø: Excavation for Jacking Pit at CH4506 (MEX Highway) in progress.
P11 – Pipeline 1400Ø: Trench excavation in progress at CH430 (Jalan BS9).
P11 – Pipeline 2500Ø: Jacking of 9th Pipe in progress at CH1989 (Jalan PBS 14/5).
P11 – Pipeline 2400Ø: Pipe laying at CH4095 (Jalan Kasturi) in progress.
P11 – Pipeline 1400Ø: Trench excavation in progress at CH430 (Jalan BS9).
P11 – Pipeline 2500Ø: Construction of Precast Chamber at CH1700 (Sg. Kuyuh) in progress.
P11 – Pipeline 2400Ø: Excavation at CH4173 (Jalan Kasturi) in progress.
P11 – Pipeline 2400Ø: Backfilling works at CH4000 (Jalan Kasturi) in progress.
P11 – Pipeline 2500Ø: Pilotting Works at CH2050 (Jalan PBS 14/5) in progress.
P11 – Pipeline 2500Ø: Pipe Jacking at CH1989 (Jalan PBS 14/5) in progress.
P11 – Pipeline 2400Ø: Trench Excavation at CH3890 (Jalan Kasturi) in progress.
P11 – Pipeline 2400Ø: Technical Meeting No.10/2017 (Site walk) at CH3880 (Jln Kasturi).
P11 – Pipeline 2400Ø: Pipe Delivery at CH3850 (Jalan Kasturi) in progress.
P11 – Pipeline 2400Ø: Installing temporary Entrance Gate at CH3750 (Jalan Kasturi)
P11 – Pipeline 1950Ø: Pipe laying at CH717 (Bandar Kinrara 6) in progress.
P11 – Pipeline 2500Ø: Excavation of Receiving Pit at CH1750 (Sungai Kuyuh) in progress.
P11 – Pipeline 1400Ø: Trench Excavation at CH400 (Jalan Kasturi) in progress.
P11 – Pipeline 2400Ø: Trench excavation at CH4244 (Jalan Kasturi) in progress.
P11 – Pipeline 2500Ø: Preparation for pipe jacking at CH1945-CH1989 in progress.
P11 – Pipeline 2400mmØ: Backfilling at CH3940 (Jalan Kasturi) in progress.
P11 – Pipeline 2500mmØ: Site Clearing at CH1800 (Sungai Kuyuh) in progress.
P11 – Pipeline 2400mmØ: Construction of Wash Through at CH3750 (Jalan Kasturi) in progress.
P11 – Pipeline 2400mmØ: Pipe Laying at CH4451 (Jalan Kasturi) in progress.
P11 – Pipeline 1950mmØ: Trimming slope at CH745 (Bandar Kinrara 6) in progress.
P11 – Pipeline 2400mmØ: Site Clearing at CH4470 (Maju Express Highway) in progress.
P11 – Pipeline 1950mmØ: Construction of Thrust Block at CH770 (Bandar Kinrara 6) in progress.
P11 – Pipeline 1950mmØ: Excavation at CH765 (Bandar Kinrara 6) in progress.
P11 – Pipeline 2400mmØ: Pipes delivery at CH3800 (Jalan Kasturi) in progress.
P11-Pipeine 1950Ø: Backfilling works at CH845 in progress.
P11 – Pipeine 1950Ø: Sand filling to pipe surround at CH875 in progress.
P11 – Pipeine 1950Ø: Construction of washout chamber at CH1500 in progress.
P11 – Pipeine 1950Ø: Trench excavation at CH825 in progress.
P11 – Pipeine 1950Ø: Ripping of hard layer for welding pit at CH825 in progress.
P11 – Pipeine 1950Ø: Pipes delivery at CH750 in progress.
P11 – Pipeine 1950Ø: Pipe laying at CH825 in progress.
P11 – Pipeine 1950Ø: Site Clearing at CH3750 in progress.
P11 – Pipeine 1950Ø: Pipes delivery at CH750 in progress.
P11 – Pipeine 1950Ø: Surveying work for Thrust Block position at CH2790 in progress.
P11 – Pipeine 1950Ø: Outlet pipe installation for Washout Chamber at CH 1500 in progress.
P11 – Pipeine 1950Ø: Pipe delivery at CH2900 in progress.
P11 – Pipeine 1950Ø: Site Clearing work at CH800 in progress.
P11 – Pipeine 1950Ø: Sand Filling at CH2830 – CH2800 in progress
P11 – Pipeine 1950Ø: Construction of Washout Chamber at CH1500 in progress.
P11 – Pipeine 1950Ø: Site Clearing work at CH750 – CH900 in progress.
P11 – Pipeine 1950Ø: Delivery of pipes and fittings at CH2890 in progress.
P11 – Pipeine 1950Ø: Pipe laying work in progress at CH2940.
P11 – Pipeine 1950Ø: Pipe Fittings delivery in progress at CH1500.
P11- Pipeine 1950Ø: Excavation work at CH2930 in progress.
P11 – Pipeine 1950Ø: Piling work for Thrust Block at CH1325 in progress.
P11 – Pipeine 1950Ø: Casting for Thrust Block done at CH1630.
P11 – Pipeine 1950Ø: Excavation works at CH2920 in progress.
P11 – Pipeine 1950Ø: Driving sheet pile in progress at CH1636.
P11 – Pipeine 1950Ø: Laying pipe for Pipe No. 4 in progress.
P11 – Pipeline: Welding works in progress.
P11 – Pipeline: PDA test on piling point in progress.
P11 –Pipeline: PDA test at CH1785 for piling point ‘A’ in progress.
P11 – Pipeline: Joint inspection for delivered pipes in progress.
P11 – Pipeline: Repairing of damaged existing road in progress.
P11 –Pipeline: Piling for thrust block of vertical bend for overcrossing at CH 1622.
P11 – Pipeline: Piling for thrust block of vertical bend for overcrossing at CH1622 to CH1775.
P11 – Pipeline: Concreting work completed at CH1600.