Open Menu
Home
Project Info
Project Background
Project Objective
Project Location Plan
Project Layout Plan
Water Treatment Process
Construction Packages
Construction Method
Open Trench Pipe Laying
Trenchless Pipe Laying
Langat 2 Project Team
Frequent Asked Questions
Work Progress
Water Treatment Plant Works
Pakej 1B
Pakej 2A
Pakej 2B
Pakej 15
Northern Corridor Treated Water Bulk Transfer Works
Pakej 6
Pakej 7
Pakej 9
Western Corridor Treated Water Bulk Transfer Works
Pakej 4
Pakej 5
Pakej 10
Pakej 11
Pakej 12
Pakej 13
Pakej 14
Announcement
Traffic Announcements
News
Events
Public Awareness
Corporate Info
About Us
Contact Us
PAAB
Home
Project Info
Project Background
Project Objective
Project Location Plan
Project Layout Plan
Water Treatment Process
Construction Packages
Construction Method
Open Trench Pipe Laying
Trenchless Pipe Laying
Langat 2 Project Team
Frequent Asked Questions
Work Progress
Water Treatment Plant Works
Pakej 1B
Pakej 2A
Pakej 2B
Pakej 15
Northern Corridor Treated Water Bulk Transfer Works
Pakej 6
Pakej 7
Pakej 9
Western Corridor Treated Water Bulk Transfer Works
Pakej 4
Pakej 5
Pakej 10
Pakej 11
Pakej 12
Pakej 13
Pakej 14
Announcement
Traffic Announcements
News
Events
Public Awareness
Corporate Info
About Us
Contact Us
PAAB
Pakej 4 : Kolam Air Imbangan Bukit Enggang Berkapasiti 210 Juta Liter 2018
print
2019
2018
2017
2016
Dec 18
Nov 18
Oct 18
Sep 18
Aug 18
Jul 18
Jun 18
May 18
Mar 18
Feb 18
Jan 18
P4 – Reservoir Compartment 4: Water Tightness Test in progress.
P4 – Reservoir Compartment 4: Casting of mass concrete support for subsoil drain in progress.
P4 – Reservoir Compartment 3: 1.5m x 1.5m penstock leakage test in progress.
P4 – Reservoir Compartment 1: Application of sodium silicate in progress.
P4 – Reservoir Roof Slab: Installation of lightning arrestor in progress.
P4 –Access Road to Main Detention Pond: Laying and compacting ACBC in progress.
P4 – Reservoir Platform: Casting kerb of anti-climb fencing in progress.
P4 –Reservoir Platform: Spot turfing works in progress.
P4 – Detention Pond A: Installation of boundary fencing in progress.
P4 – Reservoir Compartment 2: Water Tightness Test Completed.
Reservoir Compartment 2: 1.2m x 1.2m penstock leakage test for transducer chamber
in progress.
P4 – Reservoir Compartment 3: Installation of cordrain & strip drain in progress.
P4 – Reservoir Platform: Laying of hydrants pipe in progress.
P4 – Reservoir Platform: Laying of power cable in progress.
P4 – Reservoir Platform: Installation of lighting pole in progress.
P4 – Reservoir Platform: Installation of Anti-Climb Fence Gate in progress.
P4 – Reservoir Platform: Installation of Boundary Fence in progress.
P4 – Reservoir Compartment 3: Water tightness test completed.
P4 – Reservoir Compartment 1: Rectification to plug the wall leaking in progress.
P4 – Reservoir Compartment 1: Casting of support for subsoil drain in progress.
P4 –Reservoir Platform: Laying of power cable & control cable in progress.
P4 –Maintenance Access Road Main Pond: Laying of street lighting cable in progress.
P4 –Maintenance Access Road to Main Pond: Compacting roadbase in progress.
P4 – MFDP Area : Installation of boundary fencing angle post in progress.
P4 – Reservoir Compartment 3: Filling water for the water tightness test completed.
P4 –Reservoir Compartment 1: Rectification work to stop leakages on walls in progress.
P4 –Reservoir Platform: Installation of anti climb fences in progress.
P4 – Reservoir Platform: Laying of subbase for road works in progress.
P4 –Reservoir Platform: Laying of cable for street lighting in progress.
P4 –Reservoir Platform: Laying of power cable for lighting and penstock in progress.
P4 –Reservoir Platform: Plastering work to brickwall at staircase house in progress.
P4 – 1.6mØ Pipeline : Water Pressure Test completed.
P4 – Reservoir (Compartment 4) : Final inspection in progress.
P4 –Reservoir (Roof Slab): Cleaning works in progress.
P4 –Reservoir Platform (Phase 2): Turfing works in progress.
P4 – Reservoir: Installation of valve actuator for Inlet Chamber butterfly valve in progress.
P4 – Aboveground Pipeline: Earth filling to FGL 80.00m in progress
P4 – Aboveground Pipeline : Construction of stone pitching in progress.
P4 – Drainage: Construction of Interceptor Drain in progress.
P4 – Reservoir : Earth filling to FGL 108.00 in progress
P4 – Pipeline : Sand backfilling to 1600mmØ outlet pipeline in progress.
P4 – Pipeline : Construction of flowmeter chamber for 1600mmØ outlet pipeline in progress
P4 – Pipeline: 1600mmØ outlet pipes launching to saddle support and steel bridge in progress.
P4 -Pipe bridge area : Construction of stone pitching in progress
P4 – Switch House : Casting of plinth for engine room in progress.
P4 – Switch House : Painting for external wall in progress.
P4 – Drainage: Construction of manhole MH06 in progress.
P4 – Reservoir (Compartment 3 & 4): Joint inspection for joint sealant in progress.
P4 – Reservoir (Compartment 4): Casting of scour valve chamber wall (4th lift) in progress.
P4–Reservoir (Compartment 4): Casting of outlet valve chamber wall (3rd lift) in progress.
P4 – Reservoir : Earth filling to FGL 108.00m in progress.
P4 – Guard House: Small power cabling works in progress.
P4 – Switch House Analyzer Room : Installation of conduits in progress.
P4 – Guard House: Installation of lightning system on roof slab in progress.
P4 – Overcrossing Sg Perimbun: Inspection of bolt tightening using torque wrench in progress.
P4 – Pipeline: Pipe laying for 1.6mØ outlet pipeline in progress.
P4 – Drainage: Construction of roadside drain in progress.
P4 – Turfing: Slope turfing in progress.
P4 – QAQC: Joint witness for cube test (7 days) for cement grout of pot bearing pad.
P4 – Interconnecting Chamber Ø2.0m & Ø2.5m : Concreting wall 2nd lift in progress.
P4 – Outlet Valve Chamber (Compartment 4) : Concreting of wall 1st lift in progress
P4 – Penstocks : Grouting works in progress
P4 – Overflow Inlet Structure: Concreting of wall 2nd lift in progress.
P4 – Main Access Road : Compaction of crusher run in progress
P4 – Switch House : Installation of fire protection system in progress
P4 – Overcrossing at Sg. Perimbun: Construction of stone pitching channel in progress.
P4 – Pipeline: Water Pressure Test for Outlet Pipeline Ø2.5m in progress
P4 – Turfing: Turfing works in progress behind the Switch House.
P4 – Pipeline 1600Ø : Pipe laying in progress (CH416 – CH476).
P4 – Reservoir : Casting of Base Slab H10 in progress.
P4 – Reservoir : Concreting of buffle wall 1st lift at panel F13 in progress.
P4 – Outlet Valve Chamber : Concreting wall 2nd lift in progress.
P4 – Flowmeter Chamber: Installation of DN1800 electromagnetic flowmeter in progress.
P4 – Scour Chamber: Casting of base slab in progress.
P4 – Reservoir Phase 2 Platform: Filling works in progress.
P4 – Penstock: Joint Inspection for penstock installation works with supplier in progress.
P4 – TNB Sub-station: Casting of ground beam for fencing in progress.
P4 – Switch House : Laying of perimeter drain in progress.
P4 – Flood Detention Pond A : Laying of crusher run in progress.
P4 – Main Flood Detention Pond: Preparation of road subgrade in progress.
P4 – Pipeline: Pipe laying works (Inlet Pipeline 1900 mm DN) in progress.
P4 – Drainage: Construction of Berm Drain in progress.
P4 – Overflow Inlet Structure: Casting of wall in progress.
P4 – Main Access Road: Turfing works in progress.
P4 – 1.6mØ Pipeline: Casting of pile plug for pier foundation in progress.
P4 – Reservoir : Casting of Base Slab G9 in progress.
P4 – Reservoir : Casting of column heads in progress.
P4 – Reservoir : Concreting of Wall 2nd lift I11 in progress.
P4 – Overflow Inlet Structure: Excavation works at Csj 2-3 in progress.
P4 – Guard House : Painting works in progress.
P4 – Guard House : Tiling works in progress at floor and counter.
P4 – Guard House: Tiling works in progress at toilet and ablution area.
P4 – Pipeline : Painting works at outlet pipeline in progress.
P4 – Drainage: Construction of Block Drain in progress at Main Access Road (RHS).
P4 – Main Access Pond: Slope trimming and slope turfing in progress.
P4 – Reservoir : Casting of Roof Slab H14 in progress.
P4 – Reservoir : Casting of Wall E12 3rd lift in progress.
P4 – Reservoir : Casting of 2nd lift columns in progress.
P4 – Reservoir : Casting of Base Slab Outlet Chamber (Compartment 4) in progress.
P4 – Overflow Inlet Structure: Concreting of Wall (Csj8 – Csj9) in progress.
P4 – TNB Sub-station : Painting works (1st coat) in progress
P4 – TNB Sub-station : Concreting of TNB Chamber in progress.
P4 – Guard House : Installation of window frame in progress.
P4 – Switch House: Concreting for columns in progress.
P4 – Pipeline : Water Pressure Test (Inlet Pipe – Line 2) in progress.
P4 – Pipeline : Installation of Butterfly Valve in progress at Outlet Chamber.
P4 – Pipeline : Ultrasonic Test for internal joints in progress.
P4 – Drainage: Block drain in progress at Main Access Road (LHS)
P4 – FAT : FAT for Penstock at manufacturer’s place in progress.