P5 – 2.00m Ø Pipeline: Joint inspection for CH1571-CH1016 (Tmn Hulu Langat Jaya) in progress.
P5 – 1.75m Ø Pipeline: Backfilling work completed at Pit A (CH4900), Desa Saujana Langat.
P5 – 1.75m Ø Pipeline: Pipe interconnection work ready for concrete surround at Pit C.