P15- Interconnection 8: Welding work in progress.
Current
Dec 19
Nov 19
Oct 19
Sep 19
Aug 19
Jul 19
Jun 19
May 19
Apr 19
Mar 19
Feb 19
Jan 19
Completed
![](https://langat2.paab.my/wp-content/uploads/2020/02/P152.jpg)
![](https://langat2.paab.my/wp-content/uploads/2020/02/P1558.png)
![](https://langat2.paab.my/wp-content/uploads/2020/02/P15132.png)
![](https://langat2.paab.my/wp-content/uploads/2020/02/P15200.png)
![](https://langat2.paab.my/wp-content/uploads/2020/02/P152-150x150.jpg)
![](https://langat2.paab.my/wp-content/uploads/2020/02/P1558-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2020/02/P15132-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2020/02/P15200-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/12/P151.png)
P15- Existing Langat BR: Preparation work to install the marker posts in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/12/P1591.png)
P15- Existing Langat BR: Concreting work to boundary markers in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/12/P151-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/12/P1591-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/11/P15-12.jpg)
P15- Existing Langat BR: Painting to Inlet Chamber in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/11/P15-171.png)
P15- Existing Langat BR: Turfing works in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/11/P15-1134.png)
P15- Existing Langat BR: Repair work to wall finishing in progress. (Rectification of defect)
![](https://langat2.paab.my/wp-content/uploads/2019/11/P15-1235.png)
P15- Existing Langat BR: Repair work to slab cover. (Rectification of defect)
![](https://langat2.paab.my/wp-content/uploads/2019/11/P15-12-150x150.jpg)
![](https://langat2.paab.my/wp-content/uploads/2019/11/P15-171-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/11/P15-1134-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/11/P15-1235-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/11/P151.png)
P15- Interconnection 8: Turfing work in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/11/P1558.png)
P15- Existing Langat BR: Installation of ladder inside the chamber in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/11/P15145.png)
P15- Existing Langat BR: Reinstatement work to chamber cover slab.
![](https://langat2.paab.my/wp-content/uploads/2019/11/P15219.png)
P15- Interconnection 8: Painting of final coat to exposed pipe at IC8 in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/11/P15313.png)
P15- Existing Langat BR: Daily morning briefing conducted by Site Supervisor.
![](https://langat2.paab.my/wp-content/uploads/2019/11/P15398.png)
P15- Interconnection 8: Reinstatement of existing fencing in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/11/P151-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/11/P1558-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/11/P15145-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/11/P15219-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/11/P15313-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/11/P15398-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/09/P152.jpg)
P15- Interconnection 8: Preparation work for pressure test in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/09/P1579.png)
P15- Interconnection 8: Earthworks at Interconnection 8 in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/09/P15155.png)
P15- Interconnection 8: Turfing work in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/09/P15213.png)
P15- Interconnection 8: Pressure test in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/09/P152-150x150.jpg)
![](https://langat2.paab.my/wp-content/uploads/2019/09/P1579-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/09/P15155-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/09/P15213-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/08/P152-1.jpg)
P15- Interconnection 8: Completion of thrust block for connection tee to Line 7.
![](https://langat2.paab.my/wp-content/uploads/2019/08/P1588.png)
P15- Interconnection 8: Backfilling to existing pipe Line 5 and Line 7 in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/08/P15180.png)
P15- Interconnection 8: Laying of 2000mmØ 90˚bend for connection pipe in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/08/P15267.png)
P15- Interconnection 8: Construction of Washout Chamber no.4 in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/08/P15351.png)
P15- Existing Langat BR: Reinstatement of existing perimeter drains in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/08/P152-1-150x150.jpg)
![](https://langat2.paab.my/wp-content/uploads/2019/08/P1588-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/08/P15180-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/08/P15267-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/08/P15351-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/08/P152.jpg)
P15- Interconnection 8: Thrust block to connection tees (line stopping) at Line 7 completed.
![](https://langat2.paab.my/wp-content/uploads/2019/08/P15100.png)
P15- Interconnection 8: Installation of precast base slab for washout chamber No.4.
![](https://langat2.paab.my/wp-content/uploads/2019/08/P15193.png)
P15- Existing Langat BR: Installation of butterfly valves inside WO chamber No.1 in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/08/P15294.png)
P15- Existing Langat BR: Preparation to install butterfly valves inside WO chamber No.2.
![](https://langat2.paab.my/wp-content/uploads/2019/08/P15391.png)
P15- Existing Langat BR: Reinstatement of perimeter drain at guard house in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/08/P15484.png)
P15- Existing Langat BR: Reinstatement of existing fencing link in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/08/P152-150x150.jpg)
![](https://langat2.paab.my/wp-content/uploads/2019/08/P15100-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/08/P15193-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/08/P15294-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/08/P15391-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/08/P15484-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/06/P152.jpg)
P15- Interconnection 8: Backfilling work at Line 5 in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/06/P1571.png)
P15- Interconnection 8: Piloting and expose existing pipe DN 900mm at Line 7 in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/06/P15169.png)
P15- Interconnection 8: Welding work in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/06/P15226.png)
P15- Interconnection 8: Construction of thrust block in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/06/P15300.png)
P15- Existing Langat BR: Repair work to existing chain link fence in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/06/P15385.png)
P P15- Existing Langat BR: Repair work to existing perimeter drain at round tank in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/06/P152-150x150.jpg)
![](https://langat2.paab.my/wp-content/uploads/2019/06/P1571-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/06/P15169-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/06/P15226-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/06/P15300-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/06/P15385-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/05/P152.jpg)
P15- Existing Langat BR: Laying of 400mmØ discharge pipe at washout chamber No.1.
![](https://langat2.paab.my/wp-content/uploads/2019/05/P1589.png)
P15- Interconnection 8: Hacking of pile heads for support block foundation in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/05/P15186.png)
P15- Existing Langat BR: Backfilling work to completed discharge chamber in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/05/P15279.png)
P15- Existing Langat BR: Air test to collar joint inside flowmeter chamber in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/05/P152-150x150.jpg)
![](https://langat2.paab.my/wp-content/uploads/2019/05/P1589-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/05/P15186-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/05/P15279-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/04/P151-1.png)
P15- Existing Langat BR: Installation of butterfly valve at BV Chamber no.1 in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/04/P1597.png)
P15- Existing Langat BR: Laying of cover slab for existing pipe protection at Line F-G
![](https://langat2.paab.my/wp-content/uploads/2019/04/P15191.png)
P15- Interconnection 8 (IC 8): Modification of line stopping machine in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/04/P15280.png)
P15- Interconnection 8 (IC 8): Testing of line stopping machine in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/04/P15364.png)
P15- Existing Langat BR: Reinstatement of existing drainage sump in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/04/P151-1-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/04/P1597-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/04/P15191-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/04/P15280-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/04/P15364-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/04/P151.png)
P15- Existing Langat BR: Installation of butterfly valve at chamber of Line B-C in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/04/P15102.png)
P15- Existing Langat BR: Reservoir platform reinstatement work in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/04/P15187.png)
P15- Existing Langat BR: QAQC walkabout by PAAB and consultant in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/04/P15270.png)
P15- HSSE: Toolbox meeting
![](https://langat2.paab.my/wp-content/uploads/2019/04/P151-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/04/P15102-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/04/P15187-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/04/P15270-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/02/P152.jpg)
P15- Existing Langat BR: Backfilling work to Line B-C in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/02/P1574.png)
P15- Existing Langat BR: Casting of thrust block to 60˚ bend at Line G-H in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/02/P15168.png)
P15- Interconnection 8 (IC 8): Preparation and excavation to Line 5 in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/02/P15256.png)
P15- Interconnection 8 (IC 8): Pipe laying to Line G-H in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/02/P152-150x150.jpg)
![](https://langat2.paab.my/wp-content/uploads/2019/02/P1574-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/02/P15168-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/02/P15256-150x150.png)