P15- Interconnection 8: Welding work in progress.
Current
Dec 19
Nov 19
Oct 19
Sep 19
Aug 19
Jul 19
Jun 19
May 19
Apr 19
Mar 19
Feb 19
Jan 19
Completed









P15- Existing Langat BR: Preparation work to install the marker posts in progress.

P15- Existing Langat BR: Concreting work to boundary markers in progress.



P15- Existing Langat BR: Painting to Inlet Chamber in progress.

P15- Existing Langat BR: Turfing works in progress.

P15- Existing Langat BR: Repair work to wall finishing in progress. (Rectification of defect)

P15- Existing Langat BR: Repair work to slab cover. (Rectification of defect)





P15- Interconnection 8: Turfing work in progress.

P15- Existing Langat BR: Installation of ladder inside the chamber in progress.

P15- Existing Langat BR: Reinstatement work to chamber cover slab.

P15- Interconnection 8: Painting of final coat to exposed pipe at IC8 in progress.

P15- Existing Langat BR: Daily morning briefing conducted by Site Supervisor.

P15- Interconnection 8: Reinstatement of existing fencing in progress.







P15- Interconnection 8: Preparation work for pressure test in progress.

P15- Interconnection 8: Earthworks at Interconnection 8 in progress.

P15- Interconnection 8: Turfing work in progress.

P15- Interconnection 8: Pressure test in progress.





P15- Interconnection 8: Completion of thrust block for connection tee to Line 7.

P15- Interconnection 8: Backfilling to existing pipe Line 5 and Line 7 in progress.

P15- Interconnection 8: Laying of 2000mmØ 90˚bend for connection pipe in progress.

P15- Interconnection 8: Construction of Washout Chamber no.4 in progress.

P15- Existing Langat BR: Reinstatement of existing perimeter drains in progress.






P15- Interconnection 8: Thrust block to connection tees (line stopping) at Line 7 completed.

P15- Interconnection 8: Installation of precast base slab for washout chamber No.4.

P15- Existing Langat BR: Installation of butterfly valves inside WO chamber No.1 in progress.

P15- Existing Langat BR: Preparation to install butterfly valves inside WO chamber No.2.

P15- Existing Langat BR: Reinstatement of perimeter drain at guard house in progress.

P15- Existing Langat BR: Reinstatement of existing fencing link in progress.







P15- Interconnection 8: Backfilling work at Line 5 in progress.

P15- Interconnection 8: Piloting and expose existing pipe DN 900mm at Line 7 in progress.

P15- Interconnection 8: Welding work in progress.

P15- Interconnection 8: Construction of thrust block in progress.

P15- Existing Langat BR: Repair work to existing chain link fence in progress.

P P15- Existing Langat BR: Repair work to existing perimeter drain at round tank in progress.







P15- Existing Langat BR: Laying of 400mmØ discharge pipe at washout chamber No.1.

P15- Interconnection 8: Hacking of pile heads for support block foundation in progress.

P15- Existing Langat BR: Backfilling work to completed discharge chamber in progress.

P15- Existing Langat BR: Air test to collar joint inside flowmeter chamber in progress.





P15- Existing Langat BR: Installation of butterfly valve at BV Chamber no.1 in progress.

P15- Existing Langat BR: Laying of cover slab for existing pipe protection at Line F-G

P15- Interconnection 8 (IC 8): Modification of line stopping machine in progress.

P15- Interconnection 8 (IC 8): Testing of line stopping machine in progress.

P15- Existing Langat BR: Reinstatement of existing drainage sump in progress.






P15- Existing Langat BR: Installation of butterfly valve at chamber of Line B-C in progress.

P15- Existing Langat BR: Reservoir platform reinstatement work in progress.

P15- Existing Langat BR: QAQC walkabout by PAAB and consultant in progress.

P15- HSSE: Toolbox meeting





P15- Existing Langat BR: Backfilling work to Line B-C in progress.

P15- Existing Langat BR: Casting of thrust block to 60˚ bend at Line G-H in progress.

P15- Interconnection 8 (IC 8): Preparation and excavation to Line 5 in progress.

P15- Interconnection 8 (IC 8): Pipe laying to Line G-H in progress.