Open Menu
Home
Project Info
Project Background
Project Objective
Project Location Plan
Project Layout Plan
Water Treatment Process
Construction Packages
Construction Method
Open Trench Pipe Laying
Trenchless Pipe Laying
Langat 2 Project Team
Frequent Asked Questions
Work Progress
Water Treatment Plant Works
Pakej 1B
Pakej 2A
Pakej 2B
Pakej 15
Northern Corridor Treated Water Bulk Transfer Works
Pakej 6
Pakej 7
Pakej 9
Western Corridor Treated Water Bulk Transfer Works
Pakej 4
Pakej 5
Pakej 10
Pakej 11
Pakej 12
Pakej 13
Pakej 14
Announcement
Traffic Announcements
News
Events
Public Awareness
Corporate Info
About Us
Contact Us
PAAB
Home
Project Info
Project Background
Project Objective
Project Location Plan
Project Layout Plan
Water Treatment Process
Construction Packages
Construction Method
Open Trench Pipe Laying
Trenchless Pipe Laying
Langat 2 Project Team
Frequent Asked Questions
Work Progress
Water Treatment Plant Works
Pakej 1B
Pakej 2A
Pakej 2B
Pakej 15
Northern Corridor Treated Water Bulk Transfer Works
Pakej 6
Pakej 7
Pakej 9
Western Corridor Treated Water Bulk Transfer Works
Pakej 4
Pakej 5
Pakej 10
Pakej 11
Pakej 12
Pakej 13
Pakej 14
Announcement
Traffic Announcements
News
Events
Public Awareness
Corporate Info
About Us
Contact Us
PAAB
Pakej 5 : Paip Air Terawat Utama dari Kolam Air Imbangan Bukit Enggang ke Kolam Air Langat Sedia Ada dan Air Terawat Utama dari Loji Rawatan Air Langat 2 ke Kolam Air Imbangan Hulu Langat
print
2019
2019
2018
2017
2016
Dec 20
Nov 20
Oct 20
Sep 20
Aug 20
Jul 20
Jun 20
May 20
Apr 20
Mar 20
Feb 20
Jan 20
P5 – 1.75m Ø Pipeline: Install formwork for 2nd lift wall of washout chamber is in progress at Ch.1750m Jalan Kuari Sg. Long.
P5 – 1.75m Ø Pipeline: Welding work for access tee is in progress at Ch.5203m Adit 4.
P5 – 1.75m Ø Pipeline: Removing sheetpile is in progress at Ch.1450m Jalan Kuari Sg. Long.
P5 – 1.75m Ø Pipeline: Reinstate Telekom pole is in progress at Ch.1450m Jalan Kuari Sg. Long.
P5 – 1.75m Ø Pipeline: Reinstate slope is in progress at Ch.1450m Jalan Kuari Sg. Long.
P5 – 1.75m Ø Pipeline: Driven sheetpile for washout chamber is in progress at Ch.1450m Jalan Kuari Sg. Long.
P5 – 1.75m Ø Pipeline: Driven sheetpile for washout chamber is in progress at Ch.1450m Jalan Kuari Sg. Long.
P5 – 1.75m Ø Pipeline: Mobilize machineries for construct washout chamber at Ch.1750m Jalan Kuari Sg. Long.
P5 – 1.75m Ø Pipeline: Remove end cap to install access tee at Ch.5203m Adit 4.
P5 – 1.75m Ø Pipeline: Install access tee to connect pipeline gap at Ch.5203m Adit 4.
P5 – 2.00m Ø Pipeline: Repair resident houses is in progress at Casa Residence.
P5 – 2.00m Ø Pipeline: Repair resident houses is in progress at Casa Residence.
P5 – 1.75m Ø Pipeline: Clear shrub and repair earth drain due to public complaint to PAAB at Kg Sg. Michu Ch.4020m.
P5 – 1.75m Ø Pipeline: Prepare & install equipment for pressure and water leakage test at Ch.4011m downstream Sg. Michu.
P5 – 1.75m Ø Pipeline: Pumping water for pressure and leakage test at Ch.5203m Adit 4.
P5 – 2.00m Ø Pipeline: Repair resident houses is in progress at Casa Residence.
P5 – 1.75m Ø Pipeline: Joint site visit with Air Selangor pertaining changing of AC pipe to MS pipe at Arina Seafood & Jalan Kuari Sg. Long.
P5 – 1.75m Ø Pipeline: Safety Meeting No.4/ 2020 conducted at CSRK-KTAT Package 5 Meeting Room.
P5 – 1.75m Ø Pipeline: Reinstatement work at Casa Residence in progress.
P5 – 1.75m Ø Pipeline: Repair of damaged Telekom cable at CH3700 (Jln Hulu Langat) in progress.
P5 – 1.75m Ø Pipeline: Pumping water for pressure leakage test at CH5203 (Adit 4).
P5 – 1.75m Ø Pipeline: Reinstatement work at CH3800 near Arina Seafood in progress.
P5 – 1.75m Ø Pipeline: Monthly Progress Meeting No.3/2020 at CSRK-KTAT P5 Site Office.
P5–1.75m Ø Pipeline: Displaying safety notice to prevent covid-19 at CH3802 near Arina Seafood.
P5 – 1.75m Ø Pipeline: Relocation of TNB cable at CH3800 near Arina Seafood in progress.
P5 – 1.75m Ø Pipeline: Relocation of TNB cable at CH3800 near Arina Seafood in progress.
P5 – 1.75m Ø Pipeline: Relocation work of TNB cable at CH3800 near Arina Seafood in progress.
No Progress due to MCO
P5 – 1.75m Ø Pipeline: Casting of trust block for 30⁰ HB at CH3820 near Arina Seafood.
P5–2.00mØ Pipeline: Driving of temporary sheetpile at CH3817 near Arina Seafood in progress.
P5 – 1.75m Ø Pipeline: Installation of convex mirror at S-bend location (Tmn Hulu Langat Jaya).
P5 – 1.75m Ø Pipeline: Pipe laying reaching CH3808 near Arina Seafood.
P5–1.75mØ Pipeline: Pipe laying from CH3844 to CH3834 near Arina Seafood in progress.
P5–1.75mØ Pipeline: Removing sheetpiles as pipelaying completed (CH1763, Jln Kuari Sg. Long).
P5–2.00mØ Pipeline: Backfilling for pipe trench at CH1763 (Jalan Kuari Sg. Long) in progress.
P5–1.75mØ Pipeline: Driving sheet pile for pipe trench at CH3834 near Arina Seafood in progress.
P5–1.75m Ø Pipeline: Pipe laying reaching CH3426 near Arina Seafood.
P5–1.75mØ Pipeline: Tidy up the site after CNY break at CH1720 (Jln Kuari Sg. Long).
P5–1.75mØ Pipeline: Repair works at CH5010-CH4900 Jln Hulu Langat-Ampang (JKR comments).
P5–1.75mØ Pipeline: Mobilization of machineries at CH3480 (Jln Hulu Langat – Arina Seafood).
P5–1.75mØ Pipeline: Mobilization of machineries at CH1750 Jln Hulu Langat – Jln Kuari Sg. Long.