Open Menu
Home
Project Info
Project Background
Project Objective
Project Location Plan
Project Layout Plan
Water Treatment Process
Construction Packages
Construction Method
Open Trench Pipe Laying
Trenchless Pipe Laying
Langat 2 Project Team
Frequent Asked Questions
Work Progress
Water Treatment Plant Works
Pakej 1B
Pakej 2A
Pakej 2B
Pakej 15
Northern Corridor Treated Water Bulk Transfer Works
Pakej 6
Pakej 7
Pakej 9
Western Corridor Treated Water Bulk Transfer Works
Pakej 4
Pakej 5
Pakej 10
Pakej 11
Pakej 12
Pakej 13
Pakej 14
Announcement
Traffic Announcements
News
Events
Public Awareness
Corporate Info
About Us
Contact Us
PAAB
Home
Project Info
Project Background
Project Objective
Project Location Plan
Project Layout Plan
Water Treatment Process
Construction Packages
Construction Method
Open Trench Pipe Laying
Trenchless Pipe Laying
Langat 2 Project Team
Frequent Asked Questions
Work Progress
Water Treatment Plant Works
Pakej 1B
Pakej 2A
Pakej 2B
Pakej 15
Northern Corridor Treated Water Bulk Transfer Works
Pakej 6
Pakej 7
Pakej 9
Western Corridor Treated Water Bulk Transfer Works
Pakej 4
Pakej 5
Pakej 10
Pakej 11
Pakej 12
Pakej 13
Pakej 14
Announcement
Traffic Announcements
News
Events
Public Awareness
Corporate Info
About Us
Contact Us
PAAB
Pakej 5 : Paip Air Terawat Utama dari Kolam Air Imbangan Bukit Enggang ke Kolam Air Langat Sedia Ada dan Air Terawat Utama dari Loji Rawatan Air Langat 2 ke Kolam Air Imbangan Hulu Langat 2019
print
2020
2019
2018
2017
2016
Dec 19
Nov 19
Oct 19
Sep 19
Aug 19
Jul 19
Jun 19
May 19
Apr 19
Mar 19
Feb 19
Jan 19
P5–1.75mØ Pipeline: Turfing reinstatement works at Jln Delima (Tmn Sri Nanding) in progress.
P5–1.75mØ Pipeline: Construction of washout chamber (CH3446, Tmn Sri Nanding) in progress.
P5 – 1.75m Ø Pipeline: Piloting works at CH1715 crossing (Jalan Kuari Sg. Long) in progress.
P5–1.75m Ø Pipeline: Protection to existing water pipe at Jalan Kuari Sg. Long in progress.
P5–1.75mØ Pipeline: Reinstatement of existing road at CH2900-CH2970 (Taman Sri Nanding).
P5–1.75mØ Pipeline: Driving sheetpile for pipe trench at CH1715 crossing (Jalan Kuari Sg. Long).
P5 – 1.75m Ø Pipeline: Delivery of standard pipes to store yard (Jalan Tekali, Hulu Langat).
P5 – 1.75m Ø Pipeline: FDT test at CH1710 (Jalan Kuari Sg. Long crossing) in progress.
P5 – 1.75m Ø Pipeline: PAAB site visit to CH3785 (Taman Sri Nanding to Arina Seafood).
P5 – 1.75m Ø Pipeline: Casting of washout tee at CH3440 in progress.
P5 – 1.75m Ø Pipeline: Reinstatement of road kerbs at CH2330 (Petronas Bukit Nanding).
P5–1.75m Ø Pipeline: Road reinstatement at CH1711 (Jalan Kuari Sg. Long) in progress.
P5–1.75m Ø Pipeline: Construction of washout chamber (CH2390) Jln Delima, Tmn Sri Nanding.
P5 – 1.75m Ø Pipeline: Preparation for road diversion at main junction of Jalan Kuari Sg. Long.
P5 – 1.75m Ø Pipeline: Reinstatement of turfing (CH2950-CH2980) at Taman Lagenda Suria.
P5 – 1.75m Ø Pipeline: Pipe laying reaching CH3439 at Taman Sri Nanding to Arina Seafood.
P5 – 1.75m Ø Pipeline: Utilities detection for pipelaying works at junction of Jln Kuari Sg. Long.
P5 – 1.75m Ø Pipeline: Repair works at Casa Residences houses in progress.
P5–1.75mØ Pipeline: Construction of washout chamber at CH2340 Tmn Sri Nanding in progress.
P5–1.75mØ Pipeline: Preparation for pipe laying works (CH1840-CH3400) at Taman Sri Nanding.
P5 – 1.75m Ø Pipeline: Site Clearing at CH3410 (Tmn Sri Nanding to Arina Seafood) in progress.
P5–1.75mØ Pipeline: Meeting with JKR Hulu Langat for excavation work permit at FT3210.
P5–1.75mØ Pipeline: Reinstatement of guardrail at Jln Hulu Langat-Ampang (B62) in progress.
P5–1.75mØ Pipeline: Casting of thrust block at CH2370, Petronas Bukit Nanding in progress.
P5 – 1.75mØ Pipeline: Reinstatement of drainage at CH2910, Taman Lagenda Suria in progress.
P5 – 1.75m Ø Pipeline: Meeting JKR Hulu Langat representative at Petronas Bukit Nanding.
P5 – 1.75m Ø Pipeline: Pipe laying reaching CH2384 at FT3210 Petronas Bukit Nanding.
P5 – 1.75m Ø Pipeline: Driving sheetpiles from Nanding to FT3210 Arina Seafood in progress.
P5–1.75m Ø Pipeline: Driving sheetpile at FT3210 Petronas Bukit Nanding (CH2334) in progress.
P5 – 1.75m Ø Pipeline: Pipe laying reaching CH3694 from Nanding to FT3210 Arina Seafood.
P5 – 1.75m Ø Pipeline: Pipe laying reaching CH2334 at FT3210 Petronas Bukit Nanding.
P5 – 1.75m Ø Pipeline: Pipe laying reaching CH3625 at FT3210 from Nanding to Arina Seafood.
P5 – 1.75m Ø Pipeline: Pipe laying reaching CH2304 at FT3210 Petronas Bukit Nanding.
P5 – 1.75m Ø Pipeline: Reinstatement works at CH4610 Jln Hulu Langat- Ampang in progress.
P5 – 1.75m Ø Pipeline: Pipe laying reaching CH3635 at FT3210 from Nanding to Arina Seafood.
P5 – 1.75m Ø Pipeline: Safety briefing prior to internal pipe inspection at Kg. Bestari Sg. Michu.
P5 – 1.75m Ø Pipeline: Meeting with Petronas Station owner for pipelaying works in front of
Petronas Bukit Nanding station.
P5 – 1.75m Ø Pipeline: Pipe laying reaching CH2984m at Taman Sri Nanding.
P5 – 1.75m Ø Pipeline: Pipe laying reaching CH2274m at Taman Lagenda Suria.
P5 – 1.75m Ø Pipeline: Drainage reinstatement at Jalan Hulu Langat- Ampang (B62) in progress.
P5 –1.75m Ø Pipeline: Driving sheetpiles for shoring at CH2984m (Tmn Sri Nanding) in progress.
P5 – 1.75m Ø Pipeline: Pipe layingworks reaching CH2259 at Taman Lagenda Suria
P5 – 1.75m Ø Pipeline: Pipe laying works reaching CH2960 at Taman Taman Sri Nanding.
P5 – 1.75m Ø Pipeline: Briefing prior to internal pipe inspection at Jalan Hulu Langat-Ampang.
P5 – 1.75m Ø Pipeline: Casting of thrust block for 45° bend at CH2953 (Taman Sri Nanding).
P5 – 1.75m Ø Pipeline: Driving sheet pile at CH2929 – CH2949 (Tmn Sri Nanding) in progress.
P5 – 1.75m Ø Pipeline: Sand backfilling at CH2219 – CH2229 (Tmn Lagenda Suria) in progress.
P5 – 2.00m Ø Pipeline: Dry film thickness test for pipework paint in progress.
P5 – 2.00m Ø Pipeline: Road reinstatement at CH1565 (Tmn Hulu Langat Jaya) in progress.
P5 – 1.75m Ø Pipeline: Road reinstatement at CH2190 (Taman Lagenda Suria) in progress.
P5 – 1.75m Ø Pipeline: Pre-delivery inspection for 1.75mØ pipe at Allpipes factory, Serendah.
P5 – 1.75m Ø Pipeline: Reinstatement of walkway at Jacking Pit D (Taman Desa Saujana Langat).
P5 – 1.75m Ø Pipeline: Drainage reinstatement at CH5150, Jalan Hulu Langat- Ampang (B62).