P4 – Balancing Reservoir: Cable ducting paint touch up in progress.

P4 – Balancing Reservoir: Rectification to the structure in progress.



P4 – Detention Pond B: Cutting grass in progress.

P4 – Main Detention Pond: Desilting work in progress.



P4 – Main Detention Pond: Desilting works in progress.

P4 – Sg Perimbun Crossing: Rectifying defect at RC saddle support in progress.

P4 – Balancing Reservoir: Joint inspection for CPC




P4 – Main Access Road: Removing trees at slope in progress.

P4 – Interconnecting Chamber: Rectifying defect on RC wall in progress.

P4 – Guard House: Cleaning guard house in progress.




P4 – Main Access Road: Watering turfs in progress.

P4 – Main Access Road: Installation of guardrail in progress.

P4 – Flowmeter Chamber: Cleaning of chamber in progress.

P4 – Flowmeter Chamber: Rectifying concrete defect on RC wall in progress.





P4 – Detention Pond A: Rectifying concrete defect at outlet structure in progress.

P4 –Main Detention Pond: Rectifying concrete defect at inlet structure in progress.

P4 –Outlet Flowmeter Chamber: Rectifying RC wall defect in progress.

P4 – Reservoir Platform: Spot turfing work on Phase 2 Platform in progress.





P4 – Guard House: Installation of auto sliding gate in progress.

P4 – Main Access Road: Installation of guardrail post in progress.

P4 – Access Road to Main Pond: Installation of guardrail post in progress.

P4 –Main Detention Pond R.O.W : Installation of barb wire boundary fencing in progress.





P4 – Guard House: Construction of garden stone wall in progress.

P4 – Balancing Reservoir: Painting to external wall in progress.

P4 – Switch House: Fibre optic cable splicing in progress.

P4 – Main Detention Pond: Internal street lighting test in progress.

P4 – R.O.W Main Pond Outlet: Installation of boundary fencing post at Sri Budiman in progress.






P4 – Compartment 4: Casting of apron slab in progress.

P4 – Reservoir Platform: Laying and compacting roadbase 2nd layer in progress.

P4 – Reservoir Platform: Installation of FIDS panel in progress.

P4 – Pond A: Laying of ACWC at Pond A access road in progress.

P4 – Guard House: Painting work in progress.

P4 – Switch House: Genset installation in progress.







P4 – Reservoir Compartment 3: Applying sodium silicate at water contact surfaces in progress.

P4 – Reservoir Roof Slab: Installation of flashing tape at construction joint in progress.

P4 – Reservoir Platform: Connection of earthing cable to flowmeter pedestal in progress.

P4 – Reservoir Platform: Installation of accessories for the CCTV pole in progress.

P4 – Reservoir Platform: Installation of anti-climb fence in progress.

P4 – Detention Pond B: Laying and compacting ACWC to access road in progress.

P4 – Drainage: Construction of roadside PC block drain in progress.

P4 – Detention Pond A: Installation of boundary fence in progress.