Completed
![](https://langat2.paab.my/wp-content/uploads/2019/12/P42.png)
P4 – Balancing Reservoir: Cable ducting paint touch up in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/12/P490.png)
P4 – Balancing Reservoir: Rectification to the structure in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/12/P42-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/12/P490-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/11/P4-11.png)
P4 – Detention Pond B: Cutting grass in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/11/P4-167.png)
P4 – Main Detention Pond: Desilting work in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/11/P4-11-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/11/P4-167-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/11/P41.png)
P4 – Main Detention Pond: Desilting works in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/11/P479.png)
P4 – Sg Perimbun Crossing: Rectifying defect at RC saddle support in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/11/P4180.png)
P4 – Balancing Reservoir: Joint inspection for CPC
![](https://langat2.paab.my/wp-content/uploads/2019/11/P41-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/11/P479-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/11/P4180-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/08/P42.jpg)
P4 – Main Access Road: Removing trees at slope in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/08/P485.png)
P4 – Interconnecting Chamber: Rectifying defect on RC wall in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/08/P4169.png)
P4 – Guard House: Cleaning guard house in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/08/P42-150x150.jpg)
![](https://langat2.paab.my/wp-content/uploads/2019/08/P485-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/08/P4169-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/08/P41.png)
P4 – Main Access Road: Watering turfs in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/08/P473.png)
P4 – Main Access Road: Installation of guardrail in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/08/P4161.png)
P4 – Flowmeter Chamber: Cleaning of chamber in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/08/P4247.png)
P4 – Flowmeter Chamber: Rectifying concrete defect on RC wall in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/08/P41-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/08/P473-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/08/P4161-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/08/P4247-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/06/P41.png)
P4 – Detention Pond A: Rectifying concrete defect at outlet structure in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/06/P4100.png)
P4 –Main Detention Pond: Rectifying concrete defect at inlet structure in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/06/P4197.png)
P4 –Outlet Flowmeter Chamber: Rectifying RC wall defect in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/06/P4285.png)
P4 – Reservoir Platform: Spot turfing work on Phase 2 Platform in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/06/P41-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/06/P4100-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/06/P4197-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/06/P4285-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/05/P42.jpg)
P4 – Guard House: Installation of auto sliding gate in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/05/P482.png)
P4 – Main Access Road: Installation of guardrail post in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/05/P4172.png)
P4 – Access Road to Main Pond: Installation of guardrail post in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/05/P4258.png)
P4 –Main Detention Pond R.O.W : Installation of barb wire boundary fencing in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/05/P42-150x150.jpg)
![](https://langat2.paab.my/wp-content/uploads/2019/05/P482-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/05/P4172-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/05/P4258-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/04/P41-1.png)
P4 – Guard House: Construction of garden stone wall in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/04/P484.png)
P4 – Balancing Reservoir: Painting to external wall in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/04/P4163.png)
P4 – Switch House: Fibre optic cable splicing in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/04/P4229-1.png)
P4 – Main Detention Pond: Internal street lighting test in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/04/P4304.png)
P4 – R.O.W Main Pond Outlet: Installation of boundary fencing post at Sri Budiman in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/04/P41-1-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/04/P484-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/04/P4163-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/04/P4229-1-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/04/P4304-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/04/P41.png)
P4 – Compartment 4: Casting of apron slab in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/04/P468.png)
P4 – Reservoir Platform: Laying and compacting roadbase 2nd layer in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/04/P4150.png)
P4 – Reservoir Platform: Installation of FIDS panel in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/04/P4229.png)
P4 – Pond A: Laying of ACWC at Pond A access road in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/04/P4329.png)
P4 – Guard House: Painting work in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/04/P4382.png)
P4 – Switch House: Genset installation in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/04/P41-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/04/P468-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/04/P4150-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/04/P4229-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/04/P4329-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/04/P4382-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/02/P42.png)
P4 – Reservoir Compartment 3: Applying sodium silicate at water contact surfaces in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/02/P4102.png)
P4 – Reservoir Roof Slab: Installation of flashing tape at construction joint in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/02/P4211.png)
P4 – Reservoir Platform: Connection of earthing cable to flowmeter pedestal in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/02/P4305.png)
P4 – Reservoir Platform: Installation of accessories for the CCTV pole in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/02/P4401.png)
P4 – Reservoir Platform: Installation of anti-climb fence in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/02/P4495.png)
P4 – Detention Pond B: Laying and compacting ACWC to access road in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/02/P4578.png)
P4 – Drainage: Construction of roadside PC block drain in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/02/P4671.png)
P4 – Detention Pond A: Installation of boundary fence in progress.
![](https://langat2.paab.my/wp-content/uploads/2019/02/P42-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/02/P4102-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/02/P4211-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/02/P4305-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/02/P4401-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/02/P4495-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/02/P4578-150x150.png)
![](https://langat2.paab.my/wp-content/uploads/2019/02/P4671-150x150.png)