L2P06 – 1no of 10m Straight Coated Pipe Laid at CH9122m to CH9132m, Jln 10/56(AU3)
Dec 20
Nov 20
Oct 20
Sep 20
Aug 20
Jul 20
Jun 20
Mar 20
Apr 20
Mar 20
Feb 20
Jan 20

L2P06 – 1no of 2m S/Piece and 1no of 14d Bend laid at CH9613m to CH9617m, Jalan 15/56(Au3)










L2P06 – Excavation Work at CH9275m to CH9285m, Jalan 01/56 (Au3)




































L2P06 – Piloting Work in progress at CH9250m, Jalan 10/56(Au3)

L2P06 – Excavation Work in Progress at CH9457m to CH9465m, Jalan 15/56(Au3)

L2P06 – 1no of 7.3m S/piece pipe laid at CH9457m to CH9465m, Jalan 15/56(Au3)

L2P06 – Welding Work in Progress at CH9457m, Jalan15/56(Au3)

L2P06 – Piloting Work in Progress at CH9270m, Jalan 1/56(Au3)
















L2P06 – Setting up guard rail for pipe jacking at Jalan 15/56(AU3)

L2P06 – Concrete Thrust Block for 45d Bend at Jalan 10/56(AU3)























L2P06 – Excavation Work at CH9915m to CH9905m, Jalan 15/56(AU3)

L2P06 – 1no of 10m Straight pipe Laid at CH9915m to CH9905m, Jalan 15/56 (AU3)

























L2P06 – Excavation Work in Progress at CH9122m to CH9132m, Jln 10/56(AU3)

L2P06 – 1no of 10m Straight Coated Pipe Laid at CH9122m to CH9132m, Jln 10/56(AU3)



















L2P06 – Excavation Work at CH9915m to CH9905m, Jalan 15/56(AU3)






















P6 – Pipeline: Pipe laying at CH1496 to CH1486 in progress.

P6 – Pipeline: Pipe laying at CH6144 to CH6139 in progress.

P6 – Reinstatement work: Laying of crusher run at CH9030 to CH8960, Jalan AU3/12.

P6 – Reinstatement work: Laying of ACBC and ACWC at CH9030 to CH8960, Jalan AU3/12.

P6 – Pipeline: Pipe laying at CH1476 to CH1469 in progress.

P6-Pipeline: Laying of 30Ëš bend laid at CH6128 to CH6130 in progress.

P6 –Pipeline: Piloting work at Jalan AU3/12 in progress.

P6 – Pipeline: Welding work at CH1476 in progress.













P6 – Pipeworks: laying of 5m short piece pipe at ch1373.3 to ch1378.3 in progress.

P6 – Pipeworks: Pipe cutting for 90˚ bend in progress.

P6 – Pipeworks: Air test for collar joint at thrust block of saddle support.

P6 – Pipeworks: Welding in progress at CH1373.3.




No Progress due to MCO

P6-Pipeline: Laying of 11° horizontal bend to the pipeline between CH7911 and CH7912.

P6-Pipeline: Laying of 1.5m short piece at CH101 in progress.

P6-Pipeline: Casing of RC thrust block for 60° bend in progress.

P6-Pipeline: Trench excavation in progress.

P6-Pipeline: Casing of RC thrust block for 11° horizontal bend in progress.

P6-Pipeline: Casing of RC thrust block for 15° bend at CH150 in progress.

P6-Pipeline: Joint operation with MPAJ to remove the illegal gate to enter IRDK area.

P6-Pipeline: Joint operation with MPAJ to remove the illegal gate to enter IRDK area.









P6 – Technical: Pipe laying at Bukit Belacan in progress.

P6 – Technical: Pipe laying at Good Shepherd in progress.

P6 – Technical: Pipe laying at Liberty area in progress.

P6 – Technical: Pipe laying for overcrossing at Bkt Belacan in progress.

P6 – Technical: pipe laying for overcrossing at Sg Ampang in progress.

P6 – Technical: Pipe jacking at Lorong Kerja Air Lama 2 in progress.

P6 – Technical: Pipe laying at Jln Anggerik in progress.

P6 – Technical: Welding work for overcrossing at Sg Ampang in progress.

P6 – Technical: Pipe laying at Pt23 in progress.

P6 – Technical: Backfilling Work at Lorong Kerja Air Lama in progress.