Open Menu
Home
Project Info
Project Background
Project Objective
Project Location Plan
Project Layout Plan
Water Treatment Process
Construction Packages
Construction Method
Open Trench Pipe Laying
Trenchless Pipe Laying
Langat 2 Project Team
Frequent Asked Questions
Work Progress
Water Treatment Plant Works
Pakej 1B
Pakej 2A
Pakej 2B
Pakej 15
Northern Corridor Treated Water Bulk Transfer Works
Pakej 6
Pakej 7
Pakej 9
Western Corridor Treated Water Bulk Transfer Works
Pakej 4
Pakej 5
Pakej 10
Pakej 11
Pakej 12
Pakej 13
Pakej 14
Announcement
Traffic Announcements
News
Events
Public Awareness
Corporate Info
About Us
Contact Us
PAAB
Home
Project Info
Project Background
Project Objective
Project Location Plan
Project Layout Plan
Water Treatment Process
Construction Packages
Construction Method
Open Trench Pipe Laying
Trenchless Pipe Laying
Langat 2 Project Team
Frequent Asked Questions
Work Progress
Water Treatment Plant Works
Pakej 1B
Pakej 2A
Pakej 2B
Pakej 15
Northern Corridor Treated Water Bulk Transfer Works
Pakej 6
Pakej 7
Pakej 9
Western Corridor Treated Water Bulk Transfer Works
Pakej 4
Pakej 5
Pakej 10
Pakej 11
Pakej 12
Pakej 13
Pakej 14
Announcement
Traffic Announcements
News
Events
Public Awareness
Corporate Info
About Us
Contact Us
PAAB
Pakej 10 : Paip Air Terawat Utama dari Kolam Air Imbangan Bukit Enggang ke Lebuhraya Sg. Besi 2016
print
2020
2019
2018
2017
2016
Dec 16
Nov 16
Oct 16
Sep 16
Aug 16
P10 – Lake Field: Pipe Laying work (pipe no.11) in progress at CH12912
P10 – Lake Field: Pipe Laying work (pipe no.10) in progress at CH12920.
P10 – Lake Field: Excavation work in progress for trench no.11.
P10 – Lake Field: Welding work (internal) in progress for joint no.8 & no.9
P10 – Inlet Portal: Excavation work for drainage (top slope LHS) in progress.
P10 – Inlet Portal: Wire-mesh installation in progress for drainage top slope.
P10 – Inlet Portal: Spraying shotcrete (safety purpose) for drainage in progress.
P10 – Inlet Portal: Checking level for shotcrete (with formwork) with RCSB in progress
P10- Pipeline: Welding Works at CH12976 in Progress.
P10- Pipeline: Applying Primer Coat for welded joint at CH12976 in progress.
P10- Pipeline: Sand filling at CH13000 – CH12984 in progress.
P10- Pipeline: Sand Compaction at CH13000 – CH12984 in progress.
P10- Pipeline: Cement Lining Works at CH12976 in progress.
P10- Pipeline: Piloting work in progress at DBKL area (CH9175).
P10- Inlet Portal: Installation of wire mesh in progress.
P10- Inlet Portal: Preparation for soil nails drilling in progress.
P10 – CH12750 – CH13000: Pipe delivery in progress.
P10 – CH12750 – CH13000: Pipe delivery in progress.
P10 – CH12750 – CH13000: Trial digging at CH 13000.
P10 – IKRAM Laboratory: 7 days crushing test for shotcrete coring samples.
P10 – Jln Tmn Desa Cheras: Installation of project signboard in progress.
P10 – Tmn Desa Cheras: Welder qualification test in progress.
P10 – RCSB Meeting Room: Presentation & discussion by PIM’s Sub-Contractor..
P10 – Welding yard: Hoarding fabrication in progress.
P10 -General: Site Visit to Kelab Kuda Selangor.
P10 -General: Safety Briefing before proceed with Welding Test at Ikhasas HQ.
P10 -General: Welding Test in progress at Ikhasas HQ.
P10 -2.5m Ø Pipeline: Site clearing at KG Pinang CH12200 – CH12600 in progress.
P10 -2.5m Ø Pipeline: Site clearing at KG Pinang CH12200 – CH12600 in progress.