P10 – Pipeline 2500 Ø: Pipe laying works for CH11891.35 – CH11885.35 in progress.
P10 – Pipeline 2500 Ø: Pipe laying works for CH11171.80 – CH11167.80 in progress.
P10 – Outlet Portal: Laying of wire mesh at RHS of slope in progress.
Dec 19
Nov 19
Oct 19
Sep 19
Aug 19
Jul 19
Jun 19
May 19
Apr 19
Mar 19
Feb 19
Jan 19



















P10 – Pipeline 2500 Ø: Pipe laying works for CH11891.35 – CH11885.35 in progress.

P10 – Inlet Portal: Safety shotcrete at tunnel face in progress.

P10 – Inlet Portal: Drilling and installation of 12m fore poling at CH448 in progress.

P10 – Pipeline 2500 Ø: Pipe laying works for CH11565.955 – CH11557.955 in progress.

P10 – Pipeline 2500 Ø: Pipe laying works for CH.A642.1 – CH.A650.1 in progress.

P10 – Pipeline 2500 Ø: Pipe laying works for CH11722.955 – CH11730.955 in progress.

P10 – Pipeline 2500 Ø: Pipe laying works for CH11171.80 – CH11167.80 in progress.

P10 – Pipeline 2500 Ø: Pipe laying works for at CH9215.21 – CH9222.41 in progress.









P10 – Pipeline 2500 Ø: Pipe laying works at CH4886.16 – CH4878.16 in progress.

P10 – Pipeline 2500 Ø: Pipe laying works (45˚ bend) at CH11926–CH11921 in progress.

P10 – Pipeline 2500 Ø: Pipe laying works at CH11714.955 – CH11706.955 in progress.

P10 – Outlet Portal: Drilling and preparation for blasting in progress.

P10 – Inlet Portal: Drilling for rock dowel at CH388.8 in progress.

P10 – Outlet Portal: Preparation for installing steel rib no.1 section 3 at CH517.7 in progress.







P10 – Pipeline 2500 Ø: Installation of 2nd pipe jacking in progress at Army Camp.

P10 – Outlet Portal: Laying of wire mesh at RHS of slope in progress.

P10 – Pipeline 2500 Ø: Pipe laying works at CH12010.66 – CH12004.16 in progress.

P10 – Pipeline 2500 Ø: Pipe laying works at CH.4966.16 – CH.4958.16 in progress.

P10 – Pipeline 2500 Ø: Driving sheet piles in progress at Grand Saga.

P10 – Inlet Portal: Drilling & charging for blasting at CH.377 in progress.


P10 – Pipeline 2500 Ø: Pipe laying works at CH11240.40 – CH11248.40 in progress.









P10 – Outlet Portal: Drilling work for soil nailing at RHS of slope in progress.

P10 – Inlet Portal: Spraying of safety shotcrete at CH.329 in progress.

P10 – Pipeline 2500 Ø: Excavation work in progress at Taman Sri Minang.

P10 – Pipeline 2500 Ø: Pipe laying works for river crossing at Sg. Langat in progress.

P10 – Pipeline 2500 Ø: Pipe laying works at CH.A56.39 – CH.A48.39 in progress.


P10 – Outlet Portal: Drilling work for soil nailing at RHS of slope in progress.










P10 – Pipeline 2500 Ø: Pipe laying works at CH.A139.99 – CH.A131.99 in progress.

P10 – Outlet Portal: Installation of steel galvanized at RHS of slope in progress.

P10 – Pipeline 2500 Ø: Rock excavation at Lebuh Tun Hussein Onn in progress.

P10 – Pipeline 2500 Ø: Pipe laying works at CH.A534.95 – CH.A532.35 in progress.

P10 – Pipeline 2500 Ø: Pipe laying works at CH12153.9 – CH12145.9 in progress.

P10 – Pipeline 2500 Ø: Pipe laying works at CH3675.82 – CH3667.82 in progress.

P10 – Inlet Portal: Charging for blasting at CH267.5 in progress.

P10 – Outlet Portal: Drilling work for fore poling in progress.









P10 – Pipeline 2500 Ø: Installation of zip drain from CH100 – CH130 in progress.

P10 – Pipeline 2500 Ø: Pipe laying works at CH.A604.45 – CH.A606.95 in progress.

P10 – Inlet Portal: Drilling work at CH204 – CH208 in progress.

P10 – Pipeline 2500 Ø: Pipe laying works at CH.A219.99 – CH.A211.99 in progress.

P10 – Outlet Portal: Spraying first layer of shotcrete at RHS of slope in progress.

P10 – Inlet Portal: Charging for blasting at CH210 in progress.

P10 – Pipeline 2500 Ø: Pipe laying works at CH.A203.99 – CH.195.99 in progress.








P10 – Inlet Portal: Installation of rock dowel inside tunnel area in progress.

P10 – Pipeline 2500 Ø: Pipe laying works at CH3716–CH3708 in progress.

P10 – Pipeline 2500 Ø: Welding of external joint at Grand Saga Highway in progress.

P10 – Outlet Portal: Installation of steel galvanized at LHS of slope in progress.

P10 – Inlet Portal: Preparation for final shotcrete from CH.27 in progress.

P10 – Outlet Portal: Installation of rebar for capping beam at RHS of slope in progress.

P10 – Inlet Portal: Preparation for final shotcrete in progress.

P10 – Pipeline 2500 Ø: Installation of steel truss across Sg. Langat in progress.









P10 – Outlet Portal: installation 12m galvanized soil nails at LHS slope in progress.

P10 – Pipeline 2500 Ø: Pipe laying works at CH6822.05 – CH6815.2 in progress.

P10 – Pipeline 2500 Ø: Pipe laying works at CH.A316.3 – CH.A313.3 in progress.

P10 – Pipeline 2500 Ø: Pipe laying works at CH6815.2 – CH6812.25 in progress.

P10 – Outlet Portal: Installation of 12m galvanized soil nails at RHS slope in progress.

P10 – Pipeline 2500 Ø: Piloting work at CH6590.00 in progress.

P10 – Pipeline 2500 Ø: Concreting works for 45°HB at CH.6825 – CH.6822.05 in progress.

P10 – Inlet Portal: Drilling & charging to blasting face area at CH110.9 in progress.

P10 – Inlet Portal: Scaling work at CH110 – CH113 in progress.










P10 – Inlet Portal: Spraying of shotcrete inside tunnel area CH56 – CH58 in progress.

P10 – Pipeline 2500 Ø: Pipe laying works at CH3781.4- CH3773.4 in progress.

P10 – Pipeline 2500 Ø: Backfilling work at Grand Saga in progress.

P10 – Pipeline 2500 Ø: Pipe laying works at CH6875.85- CH6883.85 in progress.

P10 – Outlet Portal: Installation of dowel bars at CH39 – CH41 in progress.

P10 – Inlet Portal: Installation of strip drain at CH22.375 – CH25.375 in progress.

P10 – Pipeline 2500 Ø: Pipe laying works at CH3860.2 – CH3864.2 in progress.

P10 – Pipeline 2500 Ø: Piloting work at CH.A360 in progress.

P10 – Inlet Portal: Hacking work for steel rib installation in progress.










P10 – Inlet Portal: Drilling work at blasting area CH24 in progress.

P10 – Pipeline 2500 Ø: Pipe laying works at CHA469.300 – 461.300 in progress.

P10 – Pipeline 2500 Ø: Pipe laying works at CH8410.816 – CH8406.906 in progress.

P10 – Inlet Portal: Installation of steel rib at CH24.375 in progress.

P10 – Inlet Portal: Spraying shotcrete inside tunnel area at CH25.375 in progress.

P10 – Pipeline 2500 Ø: Pipe laying works at CH3897.8 – CH3889.8 in progress.

P10 – Pipeline 2500 Ø: Pipe laying works at CH8405.706 – CH8403.106 in progress.








P10 – Pipeline 2500 Ø: Pipe laying work at CH8320.675 to CH8319.495 in progress.

P10 – Pipeline 2500 Ø: Piloting work at CH3360 in progress.

P10 – Inlet Portal: Hacking & drilling work at bench of inlet portal in progress.

P10 – Pipeline 2500 Ø: Pipe delivery from Laksana Wibawa in progress at Kg. Pinang.

P10 – Pipeline 2500 Ø: Rock excavation in progress at Lebuh Tun Hussein Onn.
Array

P10 – Pipeline 2500 Ø: Excavation work in progress at Taman Minang Ria.

P10 – Inlet Portal: Hacking work to install steel rib at CH17.375 to CH19.375 in progress.