Open Menu
Home
Project Info
Project Background
Project Objective
Project Location Plan
Project Layout Plan
Water Treatment Process
Construction Packages
Construction Method
Open Trench Pipe Laying
Trenchless Pipe Laying
Langat 2 Project Team
Frequent Asked Questions
Work Progress
Water Treatment Plant Works
Pakej 1B
Pakej 2A
Pakej 2B
Pakej 15
Northern Corridor Treated Water Bulk Transfer Works
Pakej 6
Pakej 7
Pakej 9
Western Corridor Treated Water Bulk Transfer Works
Pakej 4
Pakej 5
Pakej 10
Pakej 11
Pakej 12
Pakej 13
Pakej 14
Announcement
Traffic Announcements
News
Events
Public Awareness
Corporate Info
About Us
Contact Us
PAAB
Home
Project Info
Project Background
Project Objective
Project Location Plan
Project Layout Plan
Water Treatment Process
Construction Packages
Construction Method
Open Trench Pipe Laying
Trenchless Pipe Laying
Langat 2 Project Team
Frequent Asked Questions
Work Progress
Water Treatment Plant Works
Pakej 1B
Pakej 2A
Pakej 2B
Pakej 15
Northern Corridor Treated Water Bulk Transfer Works
Pakej 6
Pakej 7
Pakej 9
Western Corridor Treated Water Bulk Transfer Works
Pakej 4
Pakej 5
Pakej 10
Pakej 11
Pakej 12
Pakej 13
Pakej 14
Announcement
Traffic Announcements
News
Events
Public Awareness
Corporate Info
About Us
Contact Us
PAAB
Pakej 9 : Kolam Air AU3 Berkapasiti 28 Juta Liter
print
2018
2018
2017
2016
Current
Aug 19
Jul 19
Jun 19
May 19
Apr 19
Mar 19
Feb 19
Jan 19
Completed
P9 – Road Works: Surface cleaning prior to laying of wearing course in progress.
P9 – Phase 1 Reservoir: External painting works at compartment 2 in progress.
P9 – Phase 1 Reservoir: Casting of perimeter apron slab at compartment 2 in progress.
P9 – Road Works: Laying of wearing course in progress.
P9 – Detention Pond: Desilting of detention pond in progress.
P9 – Phase 1 Reservoir: Rectification works for defect list at roof slab in progress.
P9 – Phase 1 Reservoir: Painting on external wall in progress.
P9 – Phase 1 Reservoir: Drainage work at compartment 1 in progress.
P9 – Phase 1 Reservoir: Water level monitoring for water tightness test (compartment 1).
P9 – RC Chamber: Installation of RC Precast cover for Bypass Chamber in progress.
P9 – M&E Works: Installation of copper tape for lightning protection system in progress.
P9 – Phase 1 Reservoir: Impounding water into compartment 2 for testing in progress.
P9 – Valve Installation: Installation of headstock and spindle bar in progress.
P9 – Site Formation: Turfing works at Phase 2 area in progress.
P9 – Site Formation: Turfing works at Phase 2 area in progress.
P9 – Drainage Works: Installation of HDG MS Grating in progress.
P9 – RC Chamber: Installation of precast RC slab cover in progress.
P9 – Phase 1 Reservoir: Impounding water into compartment 1 for water tightness test in progress. Water level as on 24/5/2019 is 6750mm.
P9 – Switch Room: Touch up works for external wall painting in progress.
P9 – Phase 1 Reservoir: Rectification works to plug the leakage on wall in progress.
P9 – Valve Installation: Installation of Altitude Valve in progress.
P9 – Phase 1 Reservoir: Rectification of defect at roof slab in progress.
P9 – Site Formation: Turfing works at Phase 2 area in progress.
P9 – Phase 1 Reservoir: Impounding water into compartment 1 for water tightness test in progress.
P9 – Site Clearing: Dismantlinh of temporary workers’ camp in progress.
P9 – External M&E Works: Testing for compound lighting in progress.
P9 – RC Chamber: Installation of RC slab cover for altitude valve chamber in progress.
P9 – Phase 1 Reservoir: Impounding water into compartment 1 for water tightness test in progress.
P9 – Road Works: Laying of crusher run for road-base (Zone A) in progress.
P9 – Valve Installation: Installation of 700mm DN Butterfly Valve in progress.
P9 – SI Works: Monitoring of underground water level at BH4 in progress.
P9 – M&E Works: Insulation test for compound lighting cable in progress.
P9 – Site Formation: Close turfing to the slope formation in progress.
P9 – Phase1 Reservoir Rectification works to the leaked structure inside compartment 2 in progress.
P9 – Anti-climb Fence: Installation of anti-climb panel in progress.
P9 – Pipework: Installation of 900mmØ Butterfly Valve inside inlet chamber in progress.
P9 – Pipework: Installation of 700mmØ Butterfly Valve inside inlet chamber in progress.
P9 – Site Formation: Close turfing to slope formation on top of RE Wall 1 in progress.
P9 – Phase 1 Reservoir: Impounding water into compartment 1 for water tightness test in progress.
P9 – Road Works: Compaction test (FDT) for sub-base in progress.
P9 – Road Works: Laying of crusher run for road base in progress.
P9 –M&E (External works): Cable laying for compound lighting in progress.
P9 – Drainage Works: Casting of interceptor drain on top of RE Wall 1 in progress.
P9 – Pipe Laying Works: Casting of thrust block for 45˚ 1100Ø bend in progress.
P9 – Pipe Laying Works: Pipe laying works for 1100mmØ MS pipe in progress.
P9 – Earthwork & Site Formation: Field Density Test for backfilling works in progress.
P9 – Phase 1 Reservoir: Checking for any possible cavity below the RC slab prior to rectification works for expansion joint in progress.
P9 – Pipe Laying Works: Applying bitumen wrapping to 1100mmØ MS pipe in progress.
P9 – HSSE: Installation of temporary silt fence in progress.